| 000 | 01471pam a22003254a 4500 | ||
|---|---|---|---|
| 001 | 45828408 | ||
| 003 | AUA.1 | ||
| 005 | 20120919113643.0 | ||
| 008 | 010125s2001 maua 001 0 eng | ||
| 010 | _a2001030051 | ||
| 020 | _a0072321768 | ||
| 040 |
_aDLC _cDLC _dEXN |
||
| 042 | _apcc | ||
| 049 | _aEXNa | ||
| 050 | 0 | 0 |
_aTH145 _b.P45 2006 |
| 082 | 0 | 0 |
_a624 _221 |
| 100 | 1 |
_aPeurifoy, R. L. _q(Robert Leroy), _d1902-1995. _920352 |
|
| 245 | 1 | 0 |
_aConstruction planning, equipment, and methods / _cRobert L. Peurifoy, Clifford J. Schexnayder. |
| 250 | _a6th ed. | ||
| 260 |
_aBoston : _bMcGraw-Hill, _cc2002. |
||
| 300 |
_axvii, 669 p. : _bill. ; _c24 cm. |
||
| 440 | 0 |
_aMcGraw-Hill series in construction engineering and project management. _920353 |
|
| 500 | _aIncludes index. | ||
| 650 | 0 |
_aBuilding. _920354 |
|
| 700 | 1 |
_aSchexnayder, Cliff J. _920355 |
|
| 942 |
_2lcc _cBOOK _hTH145 _i.P45 c.1 2006 |
||
| 999 |
_c5883 _d5883 |
||